Totally Unauthorized

A side of the film industry most people never see.

Friday Photo Sequence

Here’s the rig day by day:

Day 1:

Rig Day 1

Day 2:

Rig Day 2

Day 3:

Rig Day 3

Day 4:

Rig Day 4

Day 5:

Rig Day 5

Day 6:

Rig Day 6

Day 7:

Rig Day 7

Day 8:

Rig Day 8

Monday’s a prelight day, which means we’ll tweak the lighting all day.

Filed under: Photos, Work

3 Responses

  1. fueltank says:

    Just got finished reading from the beginning… thanks for a great bunch of tales from the darkside!

    The photos of the cable runs in the perms and on the video shoot are beautiful — but I do have a thing for cable.

    Glad to hear you speak positively about the unions; too often there is a lot of animosity towards them (and between them — look at Vancouver and the Teamsters).

    Your blog should be required reading along with the Set Lighting Technicians Handbook (a copy of which I found in the back of a car I rented in LA!).

    Cheers!

  2. AJ Gentile says:

    Did you mark your spot to take these photos? They’re practically perfect.

    Huh.

  3. Peggy Archer says:

    Fueltank – glad you liked the blog!

    AJ – I took the photos from halfway up the ladder into the perms. There’s a platform there, and it was the best spot to take the photo.

    Except day one. That was taken from the top of the dimmer hut – which is at the base of the ladder.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Copyright 2004 - 2009
All Rights Reserved

Blogroll

Not blogs, but cool

%d bloggers like this: