Totally Unauthorized

A side of the film industry most people never see.

Merrily we grind to a halt.

The reason to have a second unit on any shoot is either to enable the main shooting unit to work faster by not having to do small shots or to pick up stuff that either didn’t get shot due to time, wasn’t up to par for some reason, or got changed after the fact. Thus, second unit shoots are sort of a potpourri of random stuff, and today, we had two different directors as we were picking up scenes from two different episodes (television shows have a different director each episode).

Our first item up was a three-and-a-half page scene with four actors, and our first director bashed the thing out in five hours – that’s FAST. Normally, a scene that long would take most of a day (and the more actors the longer it takes because one needs to shoot the scene from a greater number of perspectives, called “coverage”. A scene with four actors will take longer than a scene with two actors, even if those actors are, say, standing around a table having a conversation), so of course we all got our hopes up that we’d continue at that pace and perhaps have, if not a short day, at least not a super long one.

Then, we switched directors.

The second director wasn’t nearly as quick as the first one – in fact, when the first unit guys came in (much later in the day) and found out who was directing the second half of our day, they just rolled their eyes and muttered something cryptic about it being a long one for us.

Apparently, this director is just – slow. Normally when things move very slowly, the reason is pretty obvious – complicated blocking (the actors movements around the set is the scene’s blocking), stunts, acts of various gods, whatever.

This director was just moving at the speed of molasses on a cold morning. Well, that, and doing a number of takes which would have horrified even David Fincher.

After the first guy who was so fast, that was just mean.

Really, though, it wasn’t that bad – I was on the dimmer board and since the board operator sits down all day I didn’t have to worry about my feet hurting, and this particular crew are a really great bunch of guys who are always fun to work with, so it was a good day.

Call time: 7 am

Wrap time: 9:30 pm

Filed under: studio lots, Work, , , , , , , , , , , , , , ,

April 2024
S M T W T F S
 123456
78910111213
14151617181920
21222324252627
282930  

Flickr Photos

Archives

Categories

Random Quote

"If people wanted you to write warmly about them, they should have behaved better." -Anne Lamott

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

Join 1,177 other subscribers

Blogroll

Not blogs, but cool